| ephemera. Installation view steel, clay, water, light,
paint, sound 2003 |
ephemera. Installation: view from South, day 1 steel,
clay, water, light, paint, sound 2003 |
ephemera. Installation: view from South, day 3 steel,
clay, water, light, paint, sound 2003 |
ephemera. Installation: Northeast wall, before erosion
process began steel, clay, water, light, paint, sound 2003 |
ephemera. Installation: Northeast wall, day 2 steel,
clay, water, light, paint, sound 2003 |
| ephemera. Installation: exterior wall detail, day
3 clay, water 2003 |
ephemera. Installation: exterior wall and floor detail,
day 3 clay, water, steel producing rust 2003 |
ephemera. Installation: interior view from South,
day 1 water dripping from ceiling, rusting steel floor 2003 |
ephemera. Installation: interior view from South,
day 4 water dripping from ceiling, rusting steel floor 2003 |
ephemera. Installation: interior floor detail, day
4 water rusting steel 2003 |